FEASIBILITY STUDY FOR THE “GORODSKAYA” THERMAL POWER STATION CONSTRUCTION PROJECT

The official goals of the “Gorodskaya” thermal power station construction project are the following:

  • to reliably provide energy for prospective investment projects to be implemented by the Polyus PJSC in the Bodaybinsky District of the Irkutsk Region, Russia;
  • to facilitate further development of the “Srednebotuobinskoe” oil and gas condensate field in the Republic of Sakha/Yakutiya, Russia, which is being developed by the Alrosa-Gas company;
  • to reliably provide electric power for consumers located in the Republic of Sakha/Yakutiya as well as in the Irkutsk Region of Russia, taking into account the energy consumption growth forecasts till 2025.

As part of the Feasibility Study specialists of our EF-TEK company did the  following: they

  • analyzed the applicable heat and electric energy growth forecasts;
  • elaborated on various thermal power station construction options;
  • chose the best suitable station layout;
  • elaborated on what top manufacturers’ equipment could be used;
  • created and suggested suitable architectural planning solutions;
  • made budget as well as social and economic efficiency calculations for the project; defined the required operation conditions for the core equipment of the thermal power station;
  • issued the power output diagram (power distribution scheme) and the construction schedule outlines;
  • evaluated the investment performance indicators;
  • made a comparison between the project’s cost and its potential economic effect;
conducted qualitative and quantitative risk assessments.